UTV 1/2 Tray Sides (Dog Box Front)

$460.00
Color
Looking to have this item freighted? Freight costs and available delivery options are calculated at checkout.
Description

Upgrade your UTV for maximum function and style with the Australian Performance Boxes UTV 1/2 Tray Sides (Dog Box Front). Engineered tough for the APB Aluminium UTV Trays, this setup is made for those who need a durable, adaptable solution for work and play. Perfect for mounting your dog box at the front of your tray, this kit includes two tray sides and a rear panel, adding security and convenience for transporting your essential gear, all while keeping your canine companions safe and comfortable up front.

Product Specifications
  • Material: Heavy-duty 3.0mm aluminium construction
  • Configuration: 2 × sides and 1 × rea
  • Application: Designed to suit front-mounted dog box applications
  • Hardware: Stainless steel 304 hinges
  • Latches: Stainless steel over-centre locking latches
  • Finish Options: Raw Alloy, Powder Coated Satin Traffic Black
Scroll through to view our detailed installation guide.

4.9 Stars from 190+ Reviews

8000+ Vehicles Upgraded

12 Month Warranty

Australia-wide Freight

How to Install Your Australian Performance Boxes UTV Tray Sides 

The Australian Performance Boxes Aluminium UTV Tray Sides are a versatile addition to any side-x-side tray, providing practical benefits for hunting, farming, camping, and more. 

Please Note: This kit is designed for DIY installation. Please read the instructions carefully, or consult a professional if you’re unsure. 

Before You Start: Ensure your vehicle is fitted with an APB UTV Tray (these tray sides are designed specifically for this tray). 

Need Help? If you have questions or need advice about the installation process, contact the Australian Performance Boxes team. 

 Installation Instructions 

1. Vehicle Preparation:

Park your SXS vehicle on a flat, stable surface and ensure it is secure. 

2. Position the Sides:

Hold one of the side panels in line with the side mounting points on your APB UTV Tray. The stainless steel hinges should align with the tray’s hinge mounts. Repeat for the second side panel and the rear panel at the back of the tray. 

Using the supplied bolts and washers, secure each hinge to the corresponding mounting point on the UTV Tray. Insert bolts through the hinge and tray bracket, place washers as needed, and thread on the nuts. Tighten the nuts with a spanner, ensuring the hinge pivots smoothly and the panel sits properly on the tray. 

3. Fit and Adjust Latches:

Close each side and rear panel to confirm alignment of the over-centre latches with their catches on the tray. Attach and adjust the latches using the supplied hardware for a firm, rattle-free hold when closed. If necessary, reposition latch catches for the best fit before fully tightening all hardware. 

4. Check Panel Operation:

Open and close each side and rear panel several times to ensure hinges and latches work smoothly. Confirm the panels sit flush with no foul points or excessive gaps. Adjust latch tension or hinge alignment as needed for secure, easy operation. 

6. Final Check:

Double-check all bolts and nuts for tightness. Ensure all panels are secure and the latches hold them firmly in place during use. Confirm that the tray sides provide the intended containment and security for items in the tray. 

×